image



Re-plumbing Project
The old copper plumbing had to be replaced with new PVC. The copper, having deteriorated, was causing a major loss of water. The two skimmers were also replaced and the equipment was re plumbed.

Back to Photo Gallery

Click picture for close up view

PICTURE 1
Copper plumbing observable at heater.



PICTURE 2
Pool water was removed.



PICTURE 3
Old "black bottom" skimmer was removed.


PICTURE 4
Old skimmer completely gone.



PICTURE 5
Holes were drilled for new water returns.



PICTURE 6
New PVC was installed.


PICTURE 7
Trenches were dug for new PVC.



PICTURE 8
New skimmer was set.



PICTURE 9
New return fittings were attached.


PICTURE 10
Concrete support was placed around new skimmer.



PICTURE 11
Concrete deck section was replaced.



PICTURE 12
Pool was refinshed around new returns.


PICTURE 13
New deck texture was applied.



PICTURE 14
Equipment was re-plumbed.



PICTURE 15
Water was replaced in pool.