image



Renovation - New Coping & Tile
This project called for only new tile and new Travertine brick coping.

Back to Photo Gallery

Click picture for close up view

PICTURE 1
Before



PICTURE 2
Close-up of loose tile and old pre-cast safety coping.



PICTURE 3
Old concrete grab rails.


PICTURE 4
Tile and coping removed.



PICTURE 5
Demolition debris removed.



PICTURE 6
New tile was set.


PICTURE 7
Detail of tile in skimmer.



PICTURE 8
New Travertine brick coping was set.



PICTURE 9
Crafstman insuring coping is level.


PICTURE 10
Coping in process of being set.



PICTURE 11
Pool being filled.



PICTURE 12
Anchors are set for new PVC grab rails.


PICTURE 13
New LED light was installed.



PICTURE 14
New PVC grab rail installed.



PICTURE 15
Mastic was installed and texture applied.